In оrder tо prоvide аdditionаl cаpacity for a top-selling product, a project team is installing a new CNC machine. Before establishing the performance baseline for customer’s critical dimension, they conduct a gauge R&R study with three operators. Each operator measures the same ten parts, three times each. Target dimension for the part dimension is 40, with USL = 60 and LSL = 20. The ANOVA gave the following estimates: σRPT = 0.71492; σRPD = 1.13692; σPART = 6.94929; σTOTAL = 7.07787 Estimate σMS. (Round to two decimals) [s] Estimate the %P/T. (Round to zero decimal places) [pt]% Based on the %P/T, is the measurement system is acceptable for use? (Yes, No or Maybe) [pta]