Acme Cоmpаny uses аn аctivity-based cоsting system (ABC) tо apply manufacturing overhead to jobs. The estimated total annual overhead cost of $1,150,000 is divided into three cost pools: Setups, Assembly, and Packaging. For Setups, the ABC allocation rate is $60 per setup, based on an estimated total number of setups of 3,200. For Assembly, the ABC allocation rate is $28 per machine hour. For Packaging, the ABC overhead cost pool is $258,000, the cost driver is units packaged, and the estimated total number of units packaged is 20,000. If Acme used a single overhead rate based on machine hours rather than an ABC system, what would be the plantwide overhead rate?